Referenzen - geordnet nach Produkten

Mexico, Estado de México, Túnel Emisor Oriente

Объект
Túnel Emisor Oriente, Estado de México,Mexico 
Область применения
Tubing Tunnel Construction
Описание
Waterproofing heavy water ingress (30 liters/second) at a depth of 80 meters.A reduction in the water flow of 80% to 6 liters/second was achieved. 
Использованные продукты
КЁСТЕР ИН 1
КЁСТЕР ИН 7
КЁСТЕР КД 2 Сухая Гидропломба
Исполнитель работ
Freyer Mexico S.A. de C.V. 
выбрать продукт:

 

 

Back

Top
Austria Brasil Bulgaria China Croatia Denmark Finland Germany Ghana Greece Hungary Italy Japan Kazakhstan Korea Kuwait Latvia Lebanon Mexico Netherlands Norway Panama Philippines Poland Portugal Romania Russia Senegal Serbia Slovakia Slovenia South Africa Thailand Turkey Ukraine United Kingdom United States of America